Rising Tide shuts down construction of a coal haulage railway line in Australia

5 Sep

A Rising Tide activist has secured himself to a tripod in the middle of the construction for the coal railway line.

Eco-activists have shut down construction of a coal haulage railway line in the Hunter Valley to protest the industry’’s expansion in the region.

A Rising Tide activist secured himself to a 10m-tall tripod during a pre-dawn raid on the Rutherford site, where a consortium of companies is planning to build a rail line to increase coal haulage to 200 million tonnes a year.

Spokesman Steve Phillips said the federal government had contributed $114 million to the project.

“Why are taxpayers’ dollars being handed over to rich mining corporations in order to prop up a polluting industry that is destroying human health and the environment?” he said.

“If all these projects go ahead, the consequences will be devastating.”

Police are on the scene but as of this post, have yet to remove the activist blocking the site.

Source

About these ads

2 Responses to “Rising Tide shuts down construction of a coal haulage railway line in Australia”

  1. ladyroisin September 5, 2012 at 7:03 pm #

    Great work guys….congratulations…..

  2. asc September 6, 2012 at 1:47 pm #

    Thanks from BC, Canada!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 18,000 other followers

%d bloggers like this: